Follow us
網站語言
中文繁體
中文简体
English
Home
About Us
About MUR
Articles of Association
Organisational Structure
Annual Report
Macau New Neighbourhood (Company)
Message from the Chairperson of the BOD
Laws and Regulations
Media Centre
What’s New
UR Stories
Photo Gallery
Videos
Projects
Iao Hon Estate
Lot P
Macau New Neighbourhood
Book an Appointment
Temporary Housing
Tender Notices
Careers Development
Contact Us
Location:
Home
/
Media Centre
/
Photo Gallery
Photo Gallery
Steel and aluminium formworks are used instead of wooden formworks at the Macau New Neighbourhood project in Hengqin.
Works on the external walls are being carried out at the Macau New Neighbourhood project in Hengqin.
Macau New Neighbourhood’s 27 residential towers and school buildings were topped out at the end of December 2022.
Over 180,000 prefabricated components are used at the Macau New Neighbourhood project in Hengqin.
MUR representatives explain to Iao Hon Estate’s Seng Yee House property owners the old neighbourhood renewal project.
A representative of MUR writes an inscription after visiting the “National Security Education Exhibition”.
MUR team members visit the “National Security Education Exhibition”.
Iao Hon Estate’s property owners are pleased with floor plan design of temporary housing units and believe that temporary housing would help boost their confidence with redevelopment.
With dedication, builders work diligently on the temporary housing project on Lot P in Areia Preta, Macau.
The construction of the temporary project on Lot P in Areia Preta is going full steam ahead.
The MNN project uses a highly efficient and eco-friendly prefabrication method for construction.
Workers use a crane to lift a prefabricated staircase for positioning and installation.
Prev
1
2
3
4
5
Next
Page 1 Showing 1 - 12,A total of 5
Back To Top